the convection oven in MIke's truck

the shelving in Omar's

Last night, we finished off our last night at Old Feast, formerly known as Current Feast, with about eight truckloads of equipment hauling.  There were six of us, four trucks and two trips.  Not my ideal evening after a fourteen-hour day, mostly because it brought the total to seventeen, but my bad back gave me an out on the really heavy lifting.  Still, it was work.  Everything got a good old-fashioned scrubbing and we got all the gas equipment to the new space in time for the plumbers to hit the ground running this morning at 6.  It should all be plumbed in in time for the inspection that allows us to turn on the gas.